4自动控制系统
您的位置:
主页 >
产品中心 >
自动控制系统 >
发电机组自动控制系统
◆手动控制屏(机组标准配置) Manual Control Panel(Standard Configuration of gen-set)
提供机组的基本启动 / 停止功能,控制屏可监控机组的各项运行状态,可直观的显示各项技术数据,并且配备了报警和保护功能,使机组运行更加安全可靠。
This panel can not only provide start/stop fundamental function, but also can supervise the running situation of the generator set through showing all the technical datas. For its alarm and protection function, the generator set can run more safely and reliably.
◆远程控制屏 Remote Control Panel
该控制屏除了标准的手动控制屏功能与配置外,且附加远程控制接口,可在远处对机组进行控制,该控制屏增加了启动延时、停机延时继电器,使操作更加方便,使运行更加可靠。
This panel not only includes manual control function and configuration, but also includes long-distance control connector. So you can control the generator set in a long distance. We fix Start time-lapse relay and Stop time-lapse relay on this panel, so that it's easier to operate and run more reliably.
◆全自动控制屏和自动负载切换(ATS)Automatic Control Panel and Automatic Loading Switching
可根据客户要求,提供自动启动控制功能和自动负载切换功能一体化的独立式控制柜,操作方便,适用于电器设备集中控制。
We can supply the freestanding control cabinet with ATS and automatic start control function. It's easy to operate and suitable for the central control of electric equipments.
A 电器连锁切换开关,可实现市电与机组发电的自动切换。B 市电、发电、带载状态指示灯
C 自动切换时间,不超过 7 秒(可调)
A National grid power and power which is generated by gen-set can be switched freely by ATS with protective function. B Status indicator lights of national grid power, generated power and loading.
C Automatic switching time, no more than 7 seconds(adjustable)
◆并机控制屏 Control Panel of Parallel Operation
手动 / 半自动 / 全自动两台或更多台并机功能,多台并联成电网, 可并入厂区内部电网亦可并入国家电网,可选择集中监测监控功能, 各机组功率可自动分配负载亦可定向分配负载,使机组管理更方便, 维护保养更有效,能节省成本,提高效率。
Manual Operation/semi-automatic/Automatic two sets or more sets are paralleled together to form a power grid for self-consumed or exporting to the public grid. Load distributed automatically or orientatedly, central control, easy to manage and maintain through this technique.Save cost and improve efficiency.